How wetland easements fixed a ditch, added water storage in Lincoln County

The project saved farmers $175,000, curbed flooding and augmented wildlife habitat. Communication and coordination at the local, state and federal level — plus easement agreements with willing landowners — made it happen. Partners included the SWCD, Yellow Medicine River Watershed District, Area II joint powers board, Minnesota Department of Transportation, NRCS.

The restored wetland on Steve Snyder’s Lincoln County property west of Ivanhoe filled shortly after work was complete. Seen here in summer 2019, it lies within an 80-acre parcel that the previous owner had enrolled in CREP. Today, it’s part of a multi-agency, three-landowner project that fixed a 100-year-old ditch system at a fraction of the cost while providing flood mitigation and habitat benefits. Photo Credit: Steve Snyder

IVANHOE — A restored wetlands project in Lincoln County could become a statewide model for achieving less costly agricultural ditch repairs with water storage, flood mitigation and wildlife habitat benefits.

The project 4 miles west of Ivanhoe saved farmers on the County Ditch 37 system about $175,000 in shared assessments. It involves three properties, starting with a 2001 Conservation Reserve Enhancement Program (CREP) enrollment, and a 2015 Reinvest in Minnesota (RIM) easement immediately upstream. A third property involves a flowage easement. All lie within the Yellow Medicine River watershed, which feeds the Minnesota River.

“It’s such a multi-benefit project. It’s good for the environment, good for flood control — and when you control flooding you reduce other pollutants,” said Dale Sterzinger, Lincoln Soil & Water Conservation District manager.

Before township, county, state and federal cooperation made the alternative possible, about 100 landowners on the 29-mile-long County Ditch 37 system would have shared the $225,000 repair cost. The alternative cost the ditch system about $50,000.

Raising a township road made it possible to increase floodwater storage on Snyder’s land to 61 acre-feet. The entire project involved three landowners, two wetland restorations and a flowage easement. Photo Credit: Area II Minnesota River Basin Projects

The original plan would have rerouted a 2-mile-long branch around the wetlands. An inspection revealed the 100-year-old tile was crumbling, leaving holes 15 feet in diameter. The entire County Ditch 37 system is evenly split between open ditch and tile.

Lincoln County Environmental Office Director Robert Olsen is the county ditch inspector responsible for overseeing the public ditch system. It includes about 153 miles of tile and 118 miles of open ditch — counting shared jurisdiction with Lyon County. In 1921, the system was built to remove surface water so land could be grazed or hayed.

“Now we are trying to farm that. We’re trying to raise row crops in these basins. The problem is the system was never designed to accommodate large amounts of subsurface drainage. Modern tiling technology and the desire to drain areas for agricultural production are not consistent with the initial intent of the original drainage systems. They would need to be much larger,” Olsen said.

As the infrastructure fails, more repairs will become necessary.

“I’ve got ideas (for) at least three more sites in Lincoln County where I believe it would be beneficial to the members of the (ditch) systems — and to meet the goals of the DNR and BWSR and Area II in improving water quality, improving habitat conditions, establishing new habitat for wildlife, and providing an area where you can store some stormwater and then release it slowly,” Olsen said.

On Stan Gorecki’s 60-acre RIM easement, Area II helped to design and install a pump station that lifts water 12 feet from tile that’s part of Lincoln County Ditch 37, and sends it south through Steve Snyder’s restored wetland to Minnesota Highway 19, where it becomes a Yellow Medicine River tributary. Photo Credit: Area II Minnesota River Basin Projects

In this case, easements plus state bonding dollars via Area II Minnesota River Basin Projects, a Marshall-based joint powers board, made it possible to install a pump station and disconnect the tile.

Area II used part of its bonding fund allocation from the state legislature to cover 75% of the pump station’s $141,445 cost. Benefiting landowners’ share included legal fees.

“Seeing a restoration on a public drainage system (was unusual). Now I see it as being a model for the entire state. It’s very much a success story,” Sterzinger said.

The pump station on Stan Gorecki’s 60-acre RIM wetland restoration can convey 1,100 gallons per minute. It lifts water 12 feet from the tile and sends it south through Steve Snyder’s 76-acre CREP wetland restoration to a culvert at Minnesota Highway 19. There, it becomes a Yellow Medicine River tributary.

“By putting all this agricultural runoff through a wetland, we hoped that we could remove some of the nutrient load. We could certainly remove the sediment load. By putting it into this wetland system and working with Kerry (Netzke), we could actually create some stormwater storage,” Olsen said.

Water pumped by the lift station from the tile first enters this basin, seen after snow melt in April 2018. Photo Credit: Area II Minnesota River Basin Projects

Area II Executive Director Kerry Netzke explained why floodwater retention is important in the region, where the Buffalo Ridge — AKA the Coteau de Prairies, a geological formation 1,000 feet higher than the floodplain below — results in 50-foot-per-mile elevation drops within the Yellow Medicine River watershed.

“As the snow melts or as the rain falls and it hits those real steep slopes, it gains that velocity and that force that creates those erosion problems as it reaches those floodplains below. By incorporating floodwater retention projects onto the landscape, we can basically stop that rain or that snowmelt where it’s happening and meter it out slowly,” Netzke said.

“We’ve got some of the most productive agricultural lands in the nation in Minnesota. By taking that (water) out of that tile system and allowing it to be retained and slowed in these wetland restorations, (it’s) better all the way around for groundwater recharge, for wildlife, for the floodwater retention benefit,” Netzke said.

“We’re sending the cleaner water downstream,” she said.

The Yellow Medicine River Watershed District set flood control as a top priority for its One Watershed, One Plan — a targeted, science-based approach to watershed-wide management. More precisely, Sterzinger said the 10-year plan aimed to create 1,000 acre-feet of storage on the land via structural practices.

The view looking north on April 3, 2020, shows the restored wetlands at their maximum water-holding capacity. The Snyder property is to the west, the Steffe flowage easement is to the the east side, and the Gorecki property is straight north of Snyder’s land. Photo Credit: Lincoln SWCD

“Everybody across the state is going to run into this looking at flood control, and they have to look at their public drainage systems as part of their plan. This is going to be a model showing how you can relate the two together,” Sterzinger said.

By creating 138.5 acre-feet of storage, Sterzinger said the project not only achieved more than 10% of that 10-year goal but also protected Granite Falls from flooding.

Gorecki’s property features a 33-acre permanent pool, and nearly 78 acre-feet of floodwater storage from a 233-acre watershed.

Snyder’s property features a 23-acre permanent pool. Raising a township road increased floodwater storage to 61 acre-feet from a 101-acre watershed. On Alan Steffes’ land, a 7.8-acre flowage easement made it possible to raise the road.

Since the work finished in November 2017, it has withstood rains that typically happen once every 10 years. Only cattail clearing was required during November 2019 maintenance.

Waterfowl appeared as soon as the basins filled. Pheasants and other wildlife populated restored upland habitat.

“Now we’ve got water that’s being treated through a fully restored wetland basin,” said Jason Beckler, Marshall-based BWSR board conservationist. “Everybody wins. You’ve got improved drainage. You’ve got a water-treatment aspect, you’ve got wildlife. … We’d love to replicate this kind of project. There’s a lot of aging drainage infrastructure in the southwest part of the state.”

In this case, communication among conservation workers and landowners allowed action when funds become available.

Stan Gorecki, 87, raised sheep and ran nearly 1,000 acres of corn and soybeans in Lincoln County. He’s retired from farming and truck driving, but still hunts the land. His four children grew up hunting; a grandson and nephews from the Twin Cities have hunted the RIM easement. Courtesy Photo

“Without a RIM easement program or a CREP program in the early 2000s this project would never have happened,” Beckler said. “This wetland will be restored perpetually. It’ll always be there. That’s what the RIM program brings to the table.”

The project evolved over several years. Failing infrastructure, and a series of wet years immediately preceded the RIM wetland sign-up period.

“If you got a big rain like we usually get during the summer, it would either drown out (the crop) or stunt it. It just wasn’t always the best, but we farmed it,” Gorecki said of the 59.8-acre RIM wetlands easement recorded in 2015.

“It wasn’t the best land, because you’d get a big rain and it would flood out. So when they came with this program, I went and asked my renter at the time what he would do. He said he would go along with them,” Gorecki said.

The $322,720 RIM easement payment sounded fair.

Snyder described what drove his purchase of the CREP land in 2012:

“My dad started bringing me pheasant hunting and duck hunting when I was 8 years old. I just always enjoyed growing up out there, and I just felt like this is a good thing for the environment, №1, and it was a good legacy to leave for future generations,” Snyder said.

Steve Snyder, 68, grew up hunting waterfowl and upland birds near Marshall. He’s easing out of his bleacher and grandstand business, Ellendale-based Seating and Athletic Facility Enterprises, and has acquired about 550 acres in Lincoln and Lyon counties with retirement income in mind. He raises English setters, and runs pointing dog field trials on the national grouse circuit. Courtesy Photo

The first habitat restoration he undertook joined the Minnesota Department of Natural Resources’ Rolling Hills and Clifton wildlife management areas east of Marshall in Lyon County. That transaction — plus renting out the tillable half of the 160 acres in Lincoln County — balanced the CREP land purchase.

“I really feel those are some of the better things I’ve done in my life. It’s lasting. It’s helping the environment, and it’s just something I wanted to do.” Snyder said.

The CREP land had been seeded with a grass mix, but cattails grew in the bottomland.

“After we had it for a few years, I started seeing that it wanted to be a slough so bad that we should make it back into a slough,” Snyder said. “The other nice thing about the slough is it helped to diversify that land. Before it was prairie grass and cattail bottoms, no water structure at all,” Snyder said.

“Without the easements and the payment, it’s not feasible for (landowners) to do these types of projects. It’s not cost-effective for an individual landowner. So we have to have easement opportunities, the cost-share on the restoration costs,” Sterzinger said. “(In) today’s farm economy, landowners can’t put a lot of money into doing this, but they are willing to maybe give up some of their land and put it into an easement to take it out of crop production.”

Sterzinger described the wetlands today as full of water and fully functional, with the overflow running as designed. Grasses are still dormant at this point, but when the native species mix flourishes, the grasses, shrubs and conifers will provide cover for wildlife.

Definitions

RIM: These conservation easements secure legal rights and restrictions on future land use. Land remains privately owned. BWSR administers the Reinvest in Minnesota program.

CREP: The voluntary Conservation Reserve Enhancement Program takes environmentally sensitive farmland out of production to protect the land, curb erosion, restore wildlife habitat and protect groundwater and surface water. The state-federal partnership includes land simultaneously enrolled in the USDA’s Farm Service Agency-administered Conservation Reserve Program for up to 15 years, and in the state’s Reinvest in Minnesota program.

Details

PROJECT PARTNERS: Landowners, Royal and Hendricks townships, Lincoln SWCD, Lincoln County, Yellow Medicine River Watershed District, Area II joint powers board, BWSR, Minnesota Department of Transportation, USDA’s Natural Resources Conservation Service

The Minnesota Board of Water and Soil Resources’ mission is to improve and protect Minnesota’s water and soil resources by working in partnership with local organizations and private landowners. Website: www.bwsr.state.mn.us

--

--

Minnesota Board of Water and Soil Resources

Our mission is to improve and protect Minnesota’s water and soil resources by working in partnership with local organizations and private landowners.